What are the setback requirements?

Dimensional Standards within the General Agricultural Zone District - Front: Minimum 25’ setback from property line. Sides and Rear: Minimum 10’ setback from property line.

Dimensional Standards within the General Residential Zone District - Front: Minimum 25’ setback from property line. Rear: Minimum 10’ setback from property line. Sides: Minimum 5’ setback from property line. 


Show All Answers

1. What is the largest structure I can build without a permit?
2. What are the setback requirements?
3. Do I need a permit to build a fence?
4. Do I need a permit to build a barn/agricultural building?
5. Does the County regulate irrigation water?
6. What is the minimum lot size for a septic system in Montrose County?
7. Do I need an engineer to design my septic system?
8. Do I need an engineer to design my foundation?
9. Can I build a second home on my property?
10. Can I just deed property to my children without going through the subdivision process?
11. What are the basic requirements for subdividing my property?
12. How do I determine the zoning of my property?
13. What are the allowed uses in my zoning district?
14. How long does the subdivision process take?
15. Will subdividing change my property tax status?
16. Does the County enforce covenants?
17. How do I determine where my property boundaries are?