How long does the subdivision process take?
Subdivision applications vary in their review time and depend largely upon the timeliness with which the required materials are submitted by the Applicant. From the date of submittal Minor Subdivisions may be completed in approximately three (3) months. Major subdivisions which require Sketch Plan, Preliminary Plan and Final Plat applications take considerably longer.

Show All Answers

1. What is the largest structure I can build without a permit?
2. What are the setback requirements?
3. Do I need a permit to build a fence?
4. Do I need a permit to build a barn/agricultural building?
5. Does the County regulate irrigation water?
6. What is the minimum lot size for a septic system in Montrose County?
7. Do I need an engineer to design my septic system?
8. Do I need an engineer to design my foundation?
9. Can I build a second home on my property?
10. Can I just deed property to my children without going through the subdivision process?
11. What are the basic requirements for subdividing my property?
12. How do I determine the zoning of my property?
13. What are the allowed uses in my zoning district?
14. How long does the subdivision process take?
15. Will subdividing change my property tax status?
16. Does the County enforce covenants?
17. How do I determine where my property boundaries are?